Low cleanability
CI · 38- Floor-mounted fixtures
- Recessed corners and joints
- Grouted and porous surfaces
- Obstructed cleaning paths
Compounding labour, inconsistent outcomes, elevated lifecycle cost.
CleanabilityIQ quantifies how geometry, materials, accessibility and operational design affect labour, hygiene, workforce sustainability and lifecycle cost — before those consequences become permanent.
Decisions are designed in, not discovered later.
Design-led
Hygiene engineering
Quantified
Lifecycle labour
Modelled
Operational drag
Measured
ESG burden
From design decision to operating consequence
01
Design
Geometry, materials, access, operational logic
02
Friction
Embedded resistance the building creates
03
Labour
Time, movement, rework, specialist access
04
Outcome
Hygiene performance and human impact
05
Cost
Cleanability premium and lifecycle exposure
CleanabilityIQ answers not only how cleanable a building is, but what operational consequences its design has created — and what those consequences will cost.
FM / Estates
Assess existing buildings and identify operational friction.
OpenArchitects / Designers
Identify maintainability issues before construction.
OpenFM / Cleaning contractors
Test productivity assumptions and tender risk.
OpenBuilding owners
Understand hidden lifecycle operational cost.
OpenProcurement
Compare operational consequences beyond capital cost.
OpenSustainability
Identify maintenance carbon and resource burden.
OpenConsultants
Provide evidence-based cleanability assessment to clients.
OpenThe premise
Design decisions made in minutes determine decades of labour, hygiene and lifecycle cost. CleanabilityIQ makes those consequences visible before they are built in.
Low cleanability
CI · 38Compounding labour, inconsistent outcomes, elevated lifecycle cost.
High cleanability
CI · 86Predictable throughput, durable hygiene, lower lifecycle burden.
The framework
Design geometry, surface continuity, accessibility.
Labour efficiency, throughput, operational speed.
Hygiene consistency, audit performance, assurance.
False efficiency
01
Design omits cleanability
Operational consequences are not modelled at brief stage.
02
Cleaning effort compounds
Geometry, surface and access decisions absorb labour.
03
Workforce pressure rises
Throughput targets erode quality and consistency.
04
Outcomes degrade
Hygiene drifts, audits slip, lifecycle cost expands.
Quick screen
This three-factor screen provides an indicative result for exploration. A Professional Cleanability Index assessment uses eight domains, 37 sub-indicators, evidence grading and critical-condition reporting — and is the only version of the Index that should be relied on for a decision.
Geometry
Open layout, wall-mounted fixtures, no tight corners
Surface
Seamless, non-porous, low grouting
Access
Reach, sightlines, equipment maneuverability
Indicative CI · quick screen
66
/ 100
Solid cleanability with room for targeted improvements.
Indicative screen only · Geometry 0–40 · Surface 0–35 · Access 0–25 · not the professional eight-domain Index
Cost consequence
Baseline operational cost is unavoidable. The Cleanability Premium is the avoidable part — the labour drag, movement, rework, access, resource and lifecycle cost the design creates. CCI is that premium expressed as a percentage of baseline.
Baseline operational cost
What cleaning this building would cost if nothing about it worked against the work.
Cleanability Premium
Labour drag · movement · rework · access · resource · lifecycle — the avoidable part the design creates.
Modelled operational cost
What the estate actually pays, year after year, with lifecycle exposure and payback modelled.
Every cost model states the confidence of its weakest input. Nothing is presented as a proven saving unless it has been verified.
Embedded friction shows up not on opening day, but year after year — in labour hours, chemical load, water draw and replacement cycles.
Low cleanability system
High cleanability system
Pricing
14-day Professional trial on monthly and yearly billing — no payment card required. Upgrade, downgrade or cancel at any time. All prices in GBP, excluding VAT.
Free
forever
1 building · 3 quick screens/month
Starter
per month, excl. VAT
£190/year · 1 assessor · 3 buildings
Professional
Recommendedper month, excl. VAT
£590/year · 3 assessors · 15 buildings · 14-day trial
Team
per month, excl. VAT
£1,490/year · 10 assessors · unlimited buildings